Est. 2017 Gainesville, TX +1-888-4-TAKNEK
OSHA 30 Certified Crews info@taknek.com
LATEST NEWS Public Works Contract
TAKNEK has been awarded the City of Idabel $40 Million Water Treatment Plant Project.
Industrial Construction

Stone Oak Pump Station Modifications

Round Rock · 2025Client: City of Round Rock
In Progress
Project overview

Overview

The project includes demolition of the existing water standpipe and hydropneumatic tank, replacement of pumps, and installation of variable frequency drive (VFD) controls at the pump station. Additional work includes installation of a standby generator, switchgear, process piping, valves, flow measurement equipment, storage tanks, and associated mechanical systems. The project also includes electrical, instrumentation, and SCADA upgrades, structural and architectural improvements, concrete foundations, utility relocations, site grading, drainage improvements, fencing, gates, paving, demolition, startup and commissioning, and all associated civil, mechanical, structural, electrical, and site work necessary to provide a complete and reliable water system facility.

Next Project

Planning a project in Industrial Construction?

Talk to our team
Email WhatsApp in LinkedIn X X (Twitter) f Facebook